2025 Progress
Work in Action

Photo Gallery

Drone view inside a loop ramp construction site with excavators, stockpiled material, and haul trucks.
default
Excavator removes broken concrete and old drainage pipe near overhead guide signs at the M‑14 corridor.
Open freeway lanes with orange barrels and an I‑275 southbound marker near the M‑14 interchange under cloudy skies.
Compactor smooths subgrade on M‑14 work area while traffic moves through a barrel‑separated lane.
Grading and hauling along M‑14 median with trucks, dozers, and excavators working next to live traffic.
On‑site concrete batch plant with aggregate conveyors and silos operating at the M‑14 construction area.
Road crew places and finishes fresh concrete pavement beside a yellow slipform paver on the M‑14 work zone.
Crews work around a large yellow slipform paver, preparing subbase and reinforcement on the M‑14 project.
Close view of paving train placing concrete on M‑14 with dowel baskets and tie bars set in the slab.
Workers spray curing compound on a newly placed M‑14 pavement segment under a bridge with traffic control cones.
Freshly paved M‑14 section curing beneath the Plymouth water tower with rollers and crews staged ahead.
Bulldozer shapes a slope beside a rock‑lined drainage outlet near the M‑14 mainline and overpass.
Granular base with dowel baskets aligned along the M‑14 corridor; barrels and equipment staged ahead.
Two excavators trench for new drainage along M‑14 while dump trucks queue beside barrier wall.
Excavator and two dump trucks in a cut section along M‑14, Plymouth water tower visible beyond tree line.
Sunlit aerial of the M‑14 and I‑275 interchange showing multiple ramps under reconstruction and active equipment.
default
Aerial view of M‑14 work zone with staged concrete pipe, excavation, and live traffic passing in adjacent lanes.
default

The Michigan Department of Transportation (MDOT) is reconstructing M-14/I-96 between Sheldon Rd and Newburgh Rd in Plymouth Township and the City of Livonia.

  • Home
  • Project Timeline
  • Information Center
  • MiDrive
  • Contact Us
Contact Us
MDOT-M14-Feedback@Michigan.gov
248-996-2034

Copyright © 2024 – 2026. This is not an official State of Michigan website.