M-14 project purpose image conveying conditions of the roadway, bridges, and trails

Road reconstruction, including all ramps and at the I-275 interchange
Bridge Rehabilitation of 17 Structures
Drainage System Improvements
New Intelligent Transportation System (ITS) Technology
Freeway Lighting Replacement
I-275 Metro Trail Improvement
Wednesday, March 11, 2026

WB I-96/M-14 at I-275 Advisory

Emergency lane and ramp closures are currently being set up at WB I-96/M-14 at the I-275 interchange due to the poor conditions of the roads:

  • WB I-96/M-14 from I-275 to Sheldon Road will be reduced to 1 LANE.
  • SB I-275 ramp to WB M-14 will be CLOSED

These areas would have been closed within the next few weeks/months for reconstruction but the recent extreme weather changes have caused major deterioration of the roads and they must be closed, as soon as possible, around noon time today.

The detour for the SB I-275 ramp closure to WB M-14 is to continue further south to WB I-94 to NB US-23 to M-14.


Friday, February 27, 2026

Update: M-14/I-96 project in Wayne County moves up scheduled lane and ramp closures

LIVONIA, Mich. – The Michigan Department of Transportation (MDOT) is returning to rebuild the westbound side of M-14/I-96 from Sheldon Road to Newburgh Road, along with numerous interchange ramps, in the city of Livonia and Plymouth Township, Wayne County. Shoulder clearing work has already begun, with all of this year’s work expected to be finished at the end of the year (restoration work is planned for 2027). During construction, traffic will be shifted onto the newly built eastbound side of M-14/I-96 with two lanes open in each direction.

All work is weather-dependent and includes: 

  • Rebuilding westbound M-14/I-96 from Sheldon Road to Newburgh Road.
  • Rebuilding the following ramps:
    • The Newburgh Road entrance ramp to westbound I-96.
    • The westbound I-96 ramps to northbound and southbound I-275.
    • The northbound and southbound I-275 ramps to westbound M-14.
    • The westbound M-14 exit and entrance ramps at Sheldon Road (Exit 20).
  • Installing center median/barrier wall with new lighting.
  • Rebuilding the I-275 Metro Trail from south of Five Mile Road to Hines Drive.

Continuing through Monday, March 2

  • Westbound M-14/I-96 will have one lane closed from I-275 to Sheldon Road for shoulder clearing.

9 a.m. Tuesday, March 3 – Monday, March 9

  • Eastbound and westbound M-14/I-96 will have at least one lane open between Sheldon Road and Newburgh Road, along with intermittent I-275 ramp closures, for barrier wall installation.

9 a.m. Tuesday, March 3 – mid-July

  • The Newburgh Road entrance ramp to westbound M-14/I-96 will be closed.

9 a.m. Tuesday, March 3 – late 2026

  • The northbound I-275 ramp to westbound M-14/I-96 will be closed.
  • Westbound M-14/I-96 Exit 20 to Sheldon Road will be closed. (Southbound I-275 traffic merging onto westbound M-14/I-96 will still have access to Sheldon Road Exit 20 until the southbound I-275 ramp to westbound M-14/I-96 is closed in June.)

9 a.m. Monday, March 9 – mid-July

  • Eastbound M-14/I-96 will have two lanes open from Sheldon Road to Newburgh Road.
  • Westbound M-14/I-96 will have up to two lanes open from Newburgh Road to Sheldon Road.

Mid-April – July

  • The westbound M-14/I-96 ramp to southbound I-275 will be closed.

June – late 2026

  • The southbound I-275 ramp to westbound M-14/I-96 will be closed.

July – late fall

  • The I-275 Metro Trail will be closed from south of Five Mile Road to Hines Drive.
  • M-14/I-96 will have two lanes open in each direction between Sheldon Road and I-275.
  • M-14/I-96 will have all lanes open in each direction between I-275 and Newburgh Road.